PROJECTS / INTERNATIONAL

– GERMANY Metro Project  / 6,55m Dia

Design,Steel Production and Preassembly 1 x Thrust Frame / 70,3 ton 1 x Pressure Ring / 22,66 ton

– FRANCE Metro Project / 9,8m Dia

Steel Production, Preassembly and Commissioning at factory 4 x Thrust Frame / 285 ton, 1 x Thrust Frame / 58 ton

– FRANCE Metro Project / 9,8m Dia

Steel Production, Preassembly and Commissioning at factory 1 x Start-Up Pipe (6 x Start-Up Rings) and Side Support / 155,29 ton 1 x Thrust Frame + 1 x Pressure Ring + 6 x Half Ring / 176,69 ton

– GERMANY Waste Water Tunnel / 4,30m Dia

Design, Steel Production, Preassembly, Commissioning and Assembly at factory 2 x California Switch / 104 ton 3 x Flat Car 12,2m x Flat Car 6m 21 x Segment Car 4 x Personal Car 1 x Boom Basket Car 1 x Cable Car

– CHILE HPP Project Transmission Tunnel / 4,5m Dia

Steel Production and Assembly 14 x Muck Car (Including 14 x Muck Container) 12 x Flat Car 4 x Segment car / 193 ton

– GERMANY Metro Project / 6,55m Dia

Design, Steel Production, Preassembly and Commissioning at factory 2 x Ramp and 2 x Middle Segment 5m / 40,5 ton

– GEORGIA HPP Project Transmission Tunnel / 4,5m Dia

Design, Steel Production and Assembly 20 x Muck Container / 41,2 ton 1 x Discharging Unit and 1 x Taverse Pressure / 5,13 ton

– GERMANY Water Tunnel Project / 4,0m Dia

Design, Steel Production, Assembly and Commissioning at factory 8 x Mortar Container 18 x Menrider 32 x Muck Car 6,2 cbm Single Axis 12 x Muck Car 6,2 cbm Boogie 15 x Muck Car 4,7 cbm 18 x Segment Car / 255,32 ton 

– GERMANY Water Tunnel Project / 4,0m Dia

Steel Production 3500 x Brake Block 500 x Willison Coupling

– FRANCE Metro Project / 9,8m Dia

Steel Production, Preassembly and Commissioning at factory 2 x Thrust Frame 2 x Pressure Ring 11 x Half Pressure Ring 3 x Intermediate Ring 8 x Sandboxes Rectangular 8 x Sandboxes Round 4 x Adaptors 1 x Start Sealing Phonix & Datwyler / 361,79 ton 

– GERMANY HPP Project Transmission Tunnel / 6,2m Dia 

Design, Steel Production and Assembly 12 x Segment Car, 4 x Pressure Ring, 4 x Flat Car for Mortar Car, 4 x Mortar Container 3 x Menrider /  26,93 ton 

– QATAR Metro Project / 7,05m Dia

Design, Steel Production, Preassembly and Commissioning at factory 28 x Muck Container / 129,64 ton 1 x Thrust Frame / 68 ton

– QATAR Metro Project / 7,05m Dia

Design, Steel Production, Preassembly and Commissioning at factory 1 x California Switch  / 61,8 ton

– NORWAY Clean Water Supply Tunnel / 7,0m Dia

Design, Steel Production and Commissioning 1104 x Gantry Rail sleepers / 52 ton

– NORWAY Clean Water Supply Tunnel / 7,0m Dia

Desing, Steel Production and Commissioning     2x Reaction Frame / 10 ton

– GERMANY Irrigation Water Tunnel / 5,30m Dia

Design, Steel Production, Preassembly and Commissioning at factory 1 x California Switch / 52 ton 1 x Discharging Unit / 8,7 ton

PROJECTS / TÜRKİYE

– KOVANLIK ENERGY – HPP TUNNEL GİRESUN / 4,33m Dia

Design, Steel Production, Preassembly and Commissioning at factory 4 x Schöma Locomotive CHL-60G 2 x California Switch Movable 24 x Muck Car 6 x Segment Car 6 x Mortar Car 3 x Flat Car 3 x Menrider 1 x Discharging Unit Hydraulic Station 4000m S30 Rail

– AÇILIM CONST. – IRRIGATION TUNNEL MALATYA / 5,30m Dia

Design, Steel Production, Preassembly and Commissioning at factory 3 x Schöma Locomotive CHL-60G 2 x California Switch Movable 18 x Muck Car 6 x Segment Car 3 x Mortar Car 3 x Flat Car 2 x Menrider 1 x Discharging Unit 12000m S30 Rail, 300xGantry Travers, 9000xRail Travers 4000xFishplate, 18000xClips

– KALYON CONST. – POTABLE WATER TUNNEL İSTANBUL / 4,50m Dia

168,71 ton Design, Steel Production, Preassembly and Commissioning at factory 3 x California Switch Movable 14000m S30 Rail

– KOLIN CONST. – HIGH SPEED TRAIN TUNNEL UŞAK / 13,77m Dia

Design, Steel Production, Preassembly and Commissioning at factory 2 x Schöma Locomotive CHL-200G + 2 x Tandem 4 x Segment Car 2 x Flat Car 4000m S30 Rail 5334 x Rail Travers + 200 x TBM Gantry Travers

– ALSIM ALARKO CONST. – KAYNARCA TUZLA METRO İSTANBUL / 6,50m Dia

Design, Steel Production, Preassembly and Commissioning at factory 3 x Schöma Locomotive CHL-200G + 3 x Tandem 6520 x Rail Travers + 2280 x Fishplate + 13040 x Clips 6000m S30 Rail

– DOĞUŞ CONST. – SULTANBEYLİ ÇEKMEKÖY METRO İSTANBUL / 6,50m Dia

Design, Steel Production, Preassembly and Commissioning at factory 56 x TBM Gantry Travers

– ÖZKA CONSTR. – AMBARLI WATER TUNNEL İSTANBUL / 4,50m Dia

3 x Schöma Locomotive CHL-60G with 4000m S20 Rail

– LİMAK CONSTRUCTION– DEVOL HPP TUNNEL ALBANIA / 6,2m Dia

3 x Schöma Locomotive CFL-180 with 4000m S30 Rail

 

Recently Viewed Close
Close

Close
Navigation
Categories